Well, it was more encouraging that this week was quite productive. Inside the house, the plumber's first fix was completed; the insulation was laid on the ground floor and the concrete was brought in by the barrow load. (Don't ask me why they did the ground floor first). Outside, a lot more gravel has been brought on site and the builders have started to landscape the grounds.
Fingers crossed for Monday though - A) Work is due to start on the first floor B) .......... and the big one .......... after months of fighting with NIHE, we are finally permitted to connect our water to the mains! Hurrah. Good luck Seamus.